 |
|
 |
|
|
|
|
| |
Home >
Carter Holt Harvey Woodproducts Australia >
Shadowclad® Plywood Cladding
SHADOWCLAD® PLYWOOD CLADDING
Install, Maintain :
Index |
|
Installation Tips
- Seal all cut edges with a preservative such as Protim LOSP. Laps and edges should be sealed with primer.
- Allow 2-3 mm between the vertical sheet joints and corner joints.
- Allow a gap of 5 mm between the bottom of the sheet and flashings for frame movement and drainage.
- Fasten all edges at 150 mm centres and 7 mm from sheet edges.
- Fasten to immediate studs and nogs at 300 mm centres.
- Do not nail through the shiplap joint.
Installation Guide
An extensive range of custom made natural anodized Aluminium flashings are also available for corners, vertical and horizontal joints. The flashings are profiled to ensure weather seal protection and cmpliment the look and feel of Shadowclad. Shadowclad accessories include 3.6 m Horizontal 'Z', 2440 mm & 3050 mm internal 90° angle and internal 'W' 90° angle and an external 90° box angle (15 x 15, 25 x 25). For professional technical advice contact a qualified Carter Holt Harvey representative, Freecall 1800 335 293.
Shadowclad MSDS is available on request, Freecall 1800 335 293.
DOWNLOAD a PDF
Shadowclad Installation Guide (834KB) |
All products contained herein © Carter Holt Harvey Woodproducts Australia. Page layout © 1996-2008 Architecture Media (Selector) Pty Ltd. All rights reserved.
|
|
|